Granny Flat Building Rules
Why is a PIM important?
That process helps identify risks and constraints early, including hazard risks, servicing and whether the exemption is likely to apply.
Can I get certification from Council that the building work complies with the Building Code?
No, the new rules remove the need for council to review the design or inspect the building work to certify that a building meets the Building Code. You can still go through the normal Building Consent process if you would like the assurance and record that the building is appropriately certified and meets Building Code regulations.
What are Development Contributions?
These contributions help fund infrastructure such as water, wastewater, stormwater, roads and community facilities, and ensure growth-related costs are mostly met by the owners of new developments rather than spread across all ratepayers. The Development Contribution cost will be assessed during the preparation of the PIM and will depend on the area it is going into and the size of the new building.
Any Development Contribution must be paid within 20 working days of completing the building work.
Can I build a granny flat on an empty section under the new rules?
Yes you can providing you meet all the exemption rules. You can't rely on the National Environmental Standards for Detached Minor Residential Units (NES-DMRU) as it only allows for a dwelling that is associated with a primary dwelling on the same site. You will need to apply District Plan rules to your property which may require a Resource Consent.
Can I build a granny flat without a kitchen, bathroom or both under the new rules?
No, to be considered under the exemption rules your small, stand-alone dwelling must include a kitchen and bathroom as the necessary facilities to be self-contained.
What happens if I have an existing granny flat, will it comply with the new rules?
If everything was done properly when it was built, it’s covered by the consents issued at the time. The new rules under the Building Act and NES-DMRU won’t affect it.
If you want to build a new granny flat, you can follow the new rules and requirements.
Can I upgrade my existing sleepout to meet the new exemption rules without needing consent?
No. The exemption only applies to new buildings. Your current sleepout should be covered by its original building consent and/or resource consent. If you want to make changes, you may need another consent, depending on what those changes are.
What happens if I start building a granny flat without a PIM being issued?
If you start any building work without a PIM being issued you are carrying out illegal building work under the Building Act. Council can issue a Notice to Fix, which is a formal legal notice requiring you to correct the situation. This means you must stop work and take steps to comply with the law, which may include:
- getting a Certificate of Acceptance for what has already been built
- applying for a building consent and/or resource consent for what is still to be built
- removal of all/or some of the building work.
Ignoring a Notice to Fix can lead to further enforcement action and penalties.
Can I buy a prefabricated building or relocate and existing building to my property?
No because the building is already constructed. Under the exemption you must apply for and receive a PIM before any building work begins. Your granny flat can be built off-site but you must ensure that no building work takes place until a PIM has been issued.
What is council’s role in enforcement and compliance for granny flats?
We keep our usual powers to deal with any building work that is unsafe or does not comply with the rules.
If I build a granny flat, will the rates for my property go up?
Yes, you will pay extra rates for your separate dwelling.