Building Forms
Form 2: Application for PIM and/or Building Consent
Note: Vetting checklists are included in the relevant Form 2 Application for PIM and/or Building Consent excluding marquees
- Simple (garages, carports, decks, retaining walls, farm buildings, marquees/temporary structures)If you are applying for a consent for a marquee you must also complete the Marquee Vetting Checklist
- Minor (demolition/removals,swimming/spa pools, solar, drainage and fireplaces (outside of Rotorua only)
- Residential (including alterations, additions, internal bathroom alterations and resited/relocated dwellings). Where a Cable Car is to be installed to a Residential property, a compliance schedule will be required, for further guidance refer to the Compliance Schedule Handbook.
- Multi residential/Industrial/Commercial Where any Specified Systems are either to be installed, altered, or removed as a result of this Building Consent and/or Amendment then each of the systems must have the applicable form completed. These application forms are listed on this page as a Specified System Form. (Generally these forms will require input from the system designer to ensure the forms are completed correctly). See the Building WOF & Compliance Schedules page for further information.
- Solid Fuel Heater/Fireplace (for use in the Rotorua district only)
Other forms
- Form 1: Agreement between commercial on-seller and purchaser
- Form 2: Amendment: Application to Amend Building Consent
- Form 2A: Memorandum from licensed building practitioner: Certificate of design work
- Form 2B: Statutory Declaration as to owner-builder status
- Form 2C: Notice of Owner-Builder
- Form 6: Application for Code Compliance Certificate
- Form 6A: Memorandum from licensed building practitioner: Record of building work
- Form 8: Application for Certificate of Acceptance you must also complete a Certificate of Acceptance Vetting Checklist
- Form 15: Application for Certificate of Public Use
- Form 21: Minor Variation (use of this form must be agreed by Inspector/Consent Assessor prior to submitting the variation)
- Advice of Licensed Building Practitioner(s) Form
- Application for Extension of Time To Start or Complete Building Work
- Application for Resite Report
- Application to Amend Historical Building Consent
- Removal Declaration
- LIM Application Form
- Assessment of Exempt Building Work
- Statement of Compliance
- Solid Fuel Heater Installation Statement of Compliance
- Restricted Building Work (Supplementary Sheet)
- Asbestos Declaration
- As built drainage A3 form (PDF 0.6MB)
Vetting checklists
Note: Vetting checklists, other than those listed below, are included in the relevant Form 2 Application for PIM and/or Building Consent (See form above).
- Certificate of Acceptance Vetting Checklist
- New Zealand Fire Service Review Checklist
- Fire Design Vetting Checklist
Specified system checklist
Complete this form whenever you install/ remove/ or alter a specified system. For example a fire alarm, auto/ security door, or ventilation system.